The good news was that Karys was outbound from Sharona. That had allowed the Trans-Temporal Express' construction crews to come at it from the slopes of Mount Karek rather than straight out of the mountain's heart. The portal was actually located east of the mountain's crest, which made the impossible cliff several hundred feet shorter from the Karys side and the approach slope perhaps three or four miles shorter from the Traisum side. TTE's engineers were accustomed to stupendous construction projects fit to dwarf the Grand Ternathian Canal or New Farnal Canal, but this one had been a stretch even for them. It had taken them years (and more tons of dynamite than Kinlafia cared to contemplate)

to complete, and all meaningful exploration down-chain from Traisum had been bottlenecked until they'd finally finished it. The cut was five miles long, eighteen hundred feet deep where its Karys terminus met the top of the approach ramp, and wide enough for a four-track right-of-way and a doublewide road for wheeled traffic. The grade, needless to say, was steep.

Now the locomotive chuffed more nosily than ever, laboring as it started into that deep, shadowed gulf of stone. Its smoke plume fumed up, adding its own fresh coat of grime and soot to the stains already marking the cut's rocky sides, and he heard the haunting beauty of the whistle singing its warning.

He stayed on the platform a little longer, looking up past the edge of the passenger car's roof overhang at the narrow strip of scorching blue sky so far overhead. Then he drew a deep breath, went back inside, and settled himself into his seat once more.

Not much longer now, he told himself. Not much longer ... for this stage, at least.

Less than two hours later, Kinlafia gazed out the passenger car window as the train clattered and banged to a halt in a vibrating screech of brakes and a long, drawnout hiss of steam.



2 из 538